Logistics & Planning

Minimum lead time for any order is 5-8 working days if there are free manufacturing capacities: production 2-3 days, delivery 3-5 days.

In most cases our reliable suppliers are fully booked 2-3 weeks ahead, therefore, when planning pallet orders, please take into account that it will be difficult to execute overnight deliveries from Latvia. However, we have a very positive experience with short delivery times if both involved parties are flexible in delivery planning!


There are three possible ways of order planning:

  • One-time orders – lead time 3-4 weeks, except if ordering standard pallets that are in stock;
  • Regular orders – customer advises on volume that is needed in particular time period and we ensure timely on-call deliveries in 5-7 days from the order placement;
  • Customer provides monthly forecast for the volume needed and we prepare the goods;

We offer the following modes of road transport:


 

tilt_tauto
Tautliner (also curtainsider) – curtain sided trailer which opens on both sides, steel back doors. Loading-unloading from both sides as well as from the back of the trailer.

Length: 13.60 m
Width: 2.44 – 2.48 m
Height: 2.65 -2.70 m

33 Europallet places
Loading capacity: 24.5 t


 

box_auto
Box trailer – Rigid sides and top, open only through back doors! Loading-unloading only through the back of the trailer!

Length: 13.60 m
Width: 2.48 m
Height: 2.65 m

33 Europallet places
Loading capacity: 23.5 t


 

fridge-auto
Fridge trailer (Reefer) – Box trailer with temperature control unit. Loading-unloading only through the back of the trailer!

Length: 13.60 m
Width: 2.48 m
Height: 2.60 – 2.70 m

33 Europallet places
Loading capacity: 23 t